Skip to content

LATEST Case Studies FROM CONROY DEVELOPMENTS

Bowthorpe Utility Recycling Project

Conroy Group recycled 2,450 tonnes of excavated material on site, eliminating 154 HGV movements and delivering over £40,000 in project savings through closed-loop recycling. Location: Bowthorpe, Norwich Job Description: Main Renewal Scheme 180mm Diameter. Material to be reprocessed: Approximately 2450 Tonnes. Recycled

Suction Excavation Productivity Case Study

A 40-day suction excavation programme across Bristol and Gloucester completed 580 excavations, averaging 14.5 excavations per day while reducing disruption and supporting the safe exposure of underground services. The following case study demonstrates the operational efficiency that can be achieved by the

Cranbrook Sewer Infrastructure Recycling Project

Conroy Group recycled 4,000m³ of excavated material on site, eliminating 430 HGV movements, avoiding landfill disposal and removing the need for 8,600 tonnes of imported aggregate. Balfour Beatty Utility Solutions (BBUSL) is the principal contractor for South West Water for sewer infrastructure

Trial Hole Case Study​

This case study shows an example of the cradle to grave process already carried out on numerous projects for various clients. Conroy Group can carry out as little or as much of the following process depending on the client’s requirements. The feasibility