Skip to content

Case Studies from Conroy GROUP

Conroy For BBUSL Bowthorpe, Norwich

Location: Bowthorpe, Norwich Job Description: Main Renewal Scheme 180mm Diameter. Material to be reprocessed: Approximately 2450 Tonnes. Recycled Materials produced: C4/NFSMR (Non flowable material.) Below shows the comparison between the methodology used on site by Conroy, where the material was reprocessed at

Suction Excavation​ – Case Study

The UK’s Premier Suction Excavation Operators The following case study demonstrates the operational efficiency that can be achieved by the use of Suction Excavators.​ How Does it Work? The lorries are fully self-sufficient, equipped with a range of tools to enable the

Recycling – Case Study ​

Balfour Beatty Utility Solutions (BBUSL) is the principal contractor for South West Water for sewer infrastructure installations. The new development named Cranbrook close to Exeter intends to deliver a self-sufficient, low-carbon new town which is intended to be the first stand-alone development

Trial Hole Case Study​

This case study shows an example of the cradle to grave process already carried out on numerous projects for various clients. Conroy Group can carry out as little or as much of the following process depending on the client’s requirements. The feasibility

For more information call us on 01754 766 499 or

For more information call us on 01754 766 499 or

WIRS_blue_1000-141
Print
Gold_RGB-141
Stamp-141
Audit_Stamp-141-v2
GIRS_blue_1000-141